倒虹吸管设计书1目录第一章设计提要······························································1第二章基本情况······························································3§2-1工程概况·····························································3§2-2水文地质·····························································3§2-3工程地质·····························································4第三章工程设计······························································6§3-1基本资料·····························································6§3-2总体布置·····························································7§3-3水力计算····························································10§3-4稳定计算····························································11§3-5结构计算····························································15第四章施工__设计·······················································16第五章工程投资·····························································19§5-1编制说明····························································19§5-2总投资·······························································23§5-3主要工程量及材料················································231第一章倒虹吸管的构造及布置第一节布置原则及形式倒虹吸管由进口段、管身段及出口段三部分组成,其总体布置应满足以下原则⒈具有较良好的地形、地质条件时,倒虹吸管的轴线应尽可能与沟谷、道路及河道等正交,管轴线的平面布置常在一直线上,以获得最短的管道轴线;⒉进口段尽可能布置在挖方(或半填挖)渠段上,以减少沉陷、渗漏及塌方现象还应考虑
①入口处必须平顺,以减少因紊流或漩涡所引起的水头损失
②小流量时仍能淹没,以避免管道内发生气蚀震动
③入口处应有防止较大砾石或其他漂浮物进入管道的设施
④进口段应保证管道不受洪水的冲击
⑤入口处应有保证人畜安全的设施
⑥应保证管道内不被泥砂淤塞⒊出口段的布置应使出口断面逐渐扩大,以降低出口水流流速,减少水头损失,防止对下游渠道的冲刷⑴对于高差不大的小型倒虹吸管,常做成竖井式或缓坡式
①竖井式倒虹吸管多用于通过流量不大、水头较小(h≤5m)的情况;其主要优点是施工方便,但水头损失大,水流条件也不如缓坡式或斜管式的水流顺畅竖井式的管道常做成方形或圆形的浆砌石或素砼结构井底部设
0.5~
0.8m深的集砂(或污物)坑,供清理泥砂及污物用
②缓坡式用于高差不大两岸又较平缓,与地平线交角约在45○以内,切管轴线又甚短的小型倒虹吸管,由开敞式的进出口斜坡与压2力管连接⑵对于高差较大的大、中型倒虹吸管有以下几种布置形式
①斜管式
②架空式第二节倒虹吸管的进出口布置进出口段总的布置原则应选择合适的结构布置及一些有效措施,以期达到水力条件良好,运行可靠,并能满足稳定、防渗、防淤及防污、防洪等要求
一、进口段结构布置进口段组成一般包括⑴与渠首连接的渐便段;⑵泄水闸;⑶拦污栅;⑷沉砂池;⑸闸门及工作桥(盖板);⑹管道进口;⑺挡水胸墙;⑻通气孔等
二、出口段结构布置流量及流速较大的倒虹吸管应在出口修建消力池,并将消力池做成渐变段形式,用于调整出口水流的流速分布,并消除一部分动能,避免冲刷下游渠道此外,双孔或多孔管道布置的出口段,为了在输送小流量时利用闸门控制流量及检修的需要,仍需设置闸门及工作桥台第三节管身、镇墩、管座形式
一、管身⒈管道的敷设方法管道埋设深度一般为
0.5~
1.0m北方严寒地区,应将管线埋设在冰冻深度以下,一般约为
0.7~
0.8m;当管道通过耕地时,应埋设在耕作层以下,一般约为
0.6~
1.0m;当穿过公路时,3为了防止管道受车辆动荷载的过大冲击力,管顶埋土厚度不小于
0.7m;当管道穿越河沟,直接埋设于河沟底时,为了防止河床被冲刷引起管道的破坏,要求坝顶埋设在冲刷线以下
0.5~
0.7m⒉管道分缝长度为了适应温度降低和砼凝固引起的纵向收缩变形及适应地基不均匀沉陷引起的纵向弯曲变形,常在管身上设置伸缩缝,缝间设止水材料据工程实践及国内一些已建管道工程的调查资料,普通管分缝的间距以15~30m为宜,露天管道取小值,完工后及时填土的地下管可取大值管壁与管座接触面上铺设沥青油毛毡(对刚性弧形管座仅在管端1/3管常范围内涂沥青,中间1/3可不涂),以减少磨阻,有利伸缩如果地基存在不均匀沉陷的情况,经过仔细处理,管节分缝可以更长些⒊接头形式、伸缩缝的止水措施接头形式一般有套管式、平接式、企口式及承插式四类低水头的预制管节采用企口接头,高水头的压力管采用套接式为宜⒋其他附属设施较长的倒虹吸管,为了保证管内不淤并能进入检查,常在靠出口位置最低的镇墩上设置冲砂孔及进人孔,进人孔的孔径不应小于
0.7m;进人孔的孔径有水平向布置与斜向布置及竖向布置多种进人孔与管道衔接的内部装设立式转动平板门,并在门缝处设橡皮,利用内水压力止水,开启较为方便进人孔若设置在管壁上,尚需在孔口部位增布钢筋以加强管身冲砂孔常采用水平向布置,一般中、小管道,冲砂孔内径常4采用
0.3~
0.4m用预制钢管埋设于镇墩中,出口处用法兰盘和高压闸阀连接,并在下游建消力池消能国内一些小型倒虹吸管不装高压闸阀而在冲砂孔出口端采用钢(或铸铁)制拍门,拍门上部用活动螺栓__,下部用插销扣住,开启时只需用简易机械将插销拉出,即可被高压水冲开拍门放淤;在拉开插销时要注意安全
二、镇墩、管座形式⒈镇墩的作用及结构形式倒虹吸管的镇墩应设置在管道的转弯处和坡度较陡的斜管上镇墩的主要作用是连接和固定两侧管道,以保证管身在外荷载作用下稳定;如斜坡管段坡度陡,常设置中间镇墩以支承上一节管身传下来的下滑力,借以减轻下部镇墩的荷载初步拟定镇墩的轮廓尺寸镇墩长度约为管内径(DB)的
1.5~
2.0倍;底部最小厚度约为管壁(δ)的2~3倍;镇墩顶部及侧墙最小厚度约为管壁厚度(δ)的
1.5~
2.0倍;镇墩中圆弧形管段的外圆弧半径(R外外)约为管道内径(DB)的
2.5~4倍;管道转弯角θ与两侧管的中心线夹角相等当管道转弯角(垂直或水平)不太大(10○<θ<15○=,或仅因须设置进人孔或放水阀而设置镇墩时,即镇墩自身即可维持稳定时,其尺寸可以按造构造要求设置,一般可按上下左右四方等于该段管壁厚把管包起来,长度视需要确定,但不宜小于该段管道的外直径砼标号不小于C10,一般不用配筋(镇墩内弯管的砼标号仍按直管不变)如镇墩上同时开有进人孔、放水孔(冲砂孔)等孔洞时,孔洞周围须布置钢筋加强⒉管座形式5在软弱地基上可用夯实的三合土、碎石或碎砖做管座对于管径及竖向力较大的管,可用浆砌石或素砼钢性管座(2αφ=90○~180○)圆管设置弧形管座后,由于圆管底部与管座间保持了一定的接触面,可改善圆管管身受力条件并减少对地基的压应力钢性管座厚度t1常用(
1.5~
2.0)δ(δ为管壁厚),且不小于
0.3m,管座肩宽t2可采用(1~
1.5)δ第二章倒虹吸管的水力计算第一节过水能力及断面尺寸
一、倒虹吸管内的水流为压力管流,过水能力可按压力管道计算Q=μωgz2z=hf+hj=(ζf+∑ζj)v2/2gμ=1/jf=1/jDLB/式中Q—过水流量m3/s;ω—过流断面m2;z—进出口水位差,即总水头损失m;μ—流量系数,无因次量,与管内沿程磨擦损失及局部阻力损失有关;ζf—沿程阻力系数;∑ζj—局部阻力系数之和;L—管道全长m;DB—圆管内直径m;hf—沿程水头损失m;6hj—局部水头损失m;v—管内平均流速(m/s);g—重力加速度(m/s2);倒虹吸管水力计算的任务,是选择适宜的流速与经济过水断面,计算管道的实际水头损失及进出口的水面衔接通常遇到以下三种情况⒈已知设计流量及管的纵向布置和轴线长,且由于地形条件限制或灌区高程的要求,上下游水位已定,要计算经济的过水断面或管道直径;⒉已知设计流量、管的纵向布置和轴线长度及允许的最大水头损失,要计算所需断面尺寸及实际水头损失,确定下游渠道水面和渠底高程;⒊已知管的纵向布置和轴线长、断面尺寸和水头损失,验算过水能力
二、过水断面计算在进口布置上,采用扭曲面,在沿轴线纵向布置上,尽量减少弯道,以减少局部水头损失管内适宜流速为
1.2~
2.5m/s选择流速后,即可按设计流量计算过水断__ω(m2)ω=Q/v
三、水头损失计算管道的水头损失,根据引起的原因不同,可分为两类一类是沿程水头损失,以hf表示;另一类是水流经过管道进出口断面变换处、闸槽、拦污栅、冲砂孔、弯道和管径变换处等的局部水头损失,以hj7表示两者之和,即为总水头损失(z)沿程水头损失与管道长度、直径大小和管内径的糙率有关,hf=gvRL224hf=gvDLB2228CgC=611RnR—断面水力半径;对于圆管,R=4BD,DB为水管内径,L—管道长度m;—沿程损失系数;C—谢才系数详见P36~54第二节进出口水力计算进出口水力计算内容包括⑴进口渐变段长度;⑵进口沉砂池;⑶出口消力池;⑷通过小流量时,进口水跃处理;⑸加大流量时壅水位确定
一、进出口渐变段长度计算为了使进入或流出倒虹吸管的水流平顺,减少水头损失,在倒虹吸管与渠道连接处常设置渐变的进出口段其长度按经验公式确定,其中第二式适用于一般中小型倒虹吸管L=C(B1~B2)8L=(4~6)h渠C—系数,进口取
1.5~
2.5,出口取
2.5~
3.5;B1—渠道水面宽度m;B2—渐变段缩窄端h渠—渠道水深,进口一般采用小值,(4h渠),出口采用大值(6h渠)
二、进口沉砂池断面尺寸计算渠道若引用多砂水流,倒虹吸管进口应设置沉砂池,以扩大断面,减缓流速,使泥砂沉淀矩形沉砂池尺寸,可先根据地形、地质条件,拟定池内水深H=h+T式中h—进口渠道水深m;T—进口渠底至沉砂池底的高差m;一般取T=(1/3~1/4)h,含砂量大的渠道按下式计算T=
0.5DB+δ+
0.2式中DB—管道内直径m;δ—管壁厚度m;沉砂池宽B=Q/Hv式中Q—渠道设计流量m3/s;v—沉砂池内平均流速m/s;当沉砂粒径在
0.25~
0.4mm时,可取池内平均流速v=
0.25~
0.5m/s;当粒径大于
0.7mm时,取v=
0.25~
0.5m/s此v值由拟定沉9砂池的过水断面来满足
三、出口消力池尺寸确定一般中小型倒虹吸管出口消力池,池长L消及池身T消身可按经验公式估算L消=(3~4)hT消≥
0.5DB+δ+
0.3m消力池以后的护底长度一般采用3~5m
四、过小流量时,进口水跃的处理为消除水跃,一些倒虹吸管在进出口采取以下工程措施⒈当管中水面与渠道水面相差不大时,克略降低管道进口底高程,在管口设一斜坡,使渠道水位在斜坡段与管口水位衔接⒉在管道进出口处插入叠梁式闸板,壅高管道进口水位,减少进口水面跌落,避免减少水跃及震动⒊当管道进口段的水面与渠水面相差不大时,将压力管口高程降至最低水位以下,并设置消力井,井底高程应使井中水深足以保证在井内发生淹没式水跃,将管口全部淹没为止如倒虹吸管较短,流量变化不大,或流量身小,上下游水位差变幅不大,亦可不加处理
五、通过加大流量时,计算挡水墙顶对进口壅水位的超高计算时,先按加大流量计算出管道沿程水头损失和局部水头损失及相应的进出口水位差z加大,进口壅水位即等于出口加大流量的水位与z加大之和应使进口渠堤顶对加大流量时的壅水位有一足够的安全超高10第三章倒虹吸管镇墩的设计倒虹吸管镇墩属重力式结构,利用自重维持本身稳定,计算内容包括⒈校核镇墩的抗滑和抗倾稳定性;⒉验算镇墩的结构强度⒊验算镇墩地基的强度及稳定性第一节作用于镇墩上的荷载作用于镇墩上的荷载可分为两大类,一类是直接作用于镇墩上的力,有内水压力沿管轴方向的轴向力;弯管段水流离心力;弯管段内水重;镇墩自重机体压力等另一类是通过管身穿给镇墩的力,有管道自重;管内水重;水面以下管道的上浮力(当镇墩设于河沟边时);管道上填土压力及管道磨擦力等计算时这两类力都要化引为轴向力,而后变换成垂直分力及水平分力,再对镇墩进行抗滑及强度计算钢筋砼管每隔一定的距离均设置伸缩缝,因而水流对管壁的摩擦力,和温度变化产生的摩擦力等,均不计算钢管由于从镇墩中心至伸缩缝节距离较长,且嵌固在镇墩内故需计算111213第一章设计提要
一、工程位置济南市小清河支流入口涵闸2002年第一批工程包括水坡、沙河二14村、沙河五村、滩头、大码头5座涵闸,涵闸位于小清河干流历城区段右岸,小清河设计桩号30+135~38+935
二、建设性质续建
三、设计标准1.洪水标准干流五年一遇排涝,__年一遇防洪,支流十年一遇排涝2.工程等别及建筑物级别工程等别为Ⅱ等,建筑物级别为二级
四、设计依据一依据文件山东省水利勘测设计院2001年编制的《山东省小清河干流治理支流入口涵闸工程初步设计》二依据规范1.《水闸设计规范》SL265-20012.《水工建筑物荷载设计规范》DL5077-19973.《水工混凝土结构设计规范》SL/T191-964.《公路桥涵设计规范》JTJ021-855.《砌体结构设计规范》G__3-886.其他有关规范、规程
五、主要工程内容本次工程共建支流入口涵闸5座,分别为水坡涵闸、沙河二村涵闸、沙河五村涵闸、滩头涵闸、大码头涵闸
六、主要工程量、材料及设备151.主要工程量1土方工程38372m32浆砌块石1___m33砼及钢筋砼239m32.主要材料1钢筋11t2水泥285t3木材6m33.设备封闭式铸铁闸门HZJ-Ⅱ型
2.0×
1.5m高×宽2扇HZY-1400型2扇HZY-1200型1扇启闭机LQD-6t2台LQC-3t2台LQC-2t1台
七、工程投资工程总投资
174.8万元,其中建筑工程
109.9万元,金属结构及__工程
16.6万元,临时工程
12.2万元,其他费用
34.4万元16第二章基本情况§2-1工程概况小清河干流济南市历城区段河道为__梯形断面,主河槽底宽30m,边坡
12.5,两岸大堤中心距210m,左岸堤顶宽
12.0,右岸堤顶宽
8.0m河底高程
16.354m~
15.18m,堤顶高程
25.23m~
24.31m水坡排水沟现状河底宽2m,深3m,河底高程
19.00m地面高程
25.40m;沙河二村排水沟现状河底宽5m,深4m,河底高程
19.83m,堤顶外2m有跨沟生产桥,桥面宽5m,桥面高程
22.70m,排水沟两侧为民房;沙河五村排水沟现状河底宽2m,深3m,河底高程
19.00m;滩头村排水沟现状河底宽3m,深5m,河底高程
18.50m;上述排水沟入小清河均无控制建筑物,大堤不连续形成缺口大码头排水沟现状河底宽5m,深4m,河底高程
18.00m1999年当地村民因出入不便,自行建造小型涵闸,工程结构比较简陋,浆砌石闸室,无闸门,闸孔宽1m,大堤下埋钢筋砼圆管,泄水流量较小,拟改建§2-2水文地质本区地下水类型主要为第四系孔隙潜水及微承压水,主要含水层岩性为砂壤土、粉砂和裂隙粘土,渗透系数K=
1.__~
10.82m/d,属中等透水层地下水埋深
1.00~
4.80m,水化学类型为HCO3和SO4—HCO3水,矿化度
0.92~
2.39g/l,属淡水~微咸水17§2-3工程地质工程地质参照山东省水利勘测设计院编制的《山东省小清河干流治理支流入口涵闸工程初步设计》5座泄水涵闸均位于黄泛冲积平原区,地层岩性在勘探深度内共有四层
①层淤泥灰黑~灰色,软~流塑状,味臭,分布于小清河干流河道中上游层面起伏较大,厚度变化幅度大,而厚度较小,层面较为平缓河底高程
15.90~
26.55m,淤泥底面高程
15.00~
26.20m淤泥层一般厚度
0.51~
1.92m,平均厚度
0.92m
②层砂壤土浅黄褐色、灰褐色,松散~稍密不均,多呈湿~饱和状,粉粒含量较高,基本出露地表,为壤土、粘土所覆盖分布较均匀稳定,厚度一般为
1.00~
9.00m,平均厚度
4.69m,层底高程
12.00~
25.00m
③层淤泥质粘土灰黑色、灰褐色,呈软可塑~可塑状,含碳质物,偶见有贝壳、小螺、草根等杂物分布广,起伏变化大,厚度不一,分布不稳定
④层壤土夹姜石黄褐色、灰褐色、棕褐色、褐色,软可塑~硬可塑状,粉粒含量普遍较高局部粘土姜石直径一般在
2.0cm左右,呈棱角~次棱角状,含量一般小于10%,局部高达20%~30%,在勘探深度内未被揭穿,可见厚度
0.40~
6.20m,平均
2.60m各建筑物持力层的物理力学指标见表118各建筑物持力层的物理力学指标表表1序号干流桩号涵闸名称持力层物理力学指标标惯击数干密度压缩系数粘聚力内摩擦角φN
63.5g/cm2a
0.1~
0.3Kpa度130+135水坡涵闸
4.
61.
530.
2616.
714.9232+425沙河二村涵闸333+940沙河五村涵闸435+285滩头村涵闸538+935大码头涵闸19第三章工程设计§3-1基本资料
一、工程任务通过兴建水坡、沙河二村、沙河五村、滩头村、大码头支流入口涵闸,完善小清河干流防洪工程体系,使其发挥防洪、排涝、灌溉等综合效益
二、工程标准1.干流治理标准防洪按__年一遇,排涝按五年一遇2.支流治理标准排水标准采用十年一遇
三、工程等别及建筑物级别小清河干流治理支流入口泄水涵闸工程的工程等别为Ⅱ等,建筑物级别2级
四、设计基本资料各涵闸的特征水位及流量见表220涵闸主要设计指标表表2序号干流桩号涵闸名称岸别排涝流量m3/s排涝水位m支流河底高程m闸上支流闸下干流十年一遇十年一遇十年一遇130+135水坡涵闸右
0.
622.
5022.35232+425沙河二村涵闸右
3.
722.
2622.
1219.5333+940沙河五村涵闸右
0.
922.
1121.
9920.3435+285滩头村涵闸右
1.
122.
0121.__
19.0538+935大码头涵闸右
3.
221.
7421.
6917.0§3-2水力计算
一、建筑物结构尺寸的确定1.过流能力计算1按经验公式计算短洞的极限长度当I≈0时,Lk=64-163mH式中m—涵洞进口流量系数,一般取m=
0.32~
0.36;H—上游水头涵洞洞身长L<Lk为短洞2有压涵洞淹没出流计算公式Q=μHω290htiLHRCgL2ZH21式中Q—涵洞过流量m3/s;μH—淹没出流的流量系数;L—涵洞长度m;21ω—过流断__m2;C—谢才系数;R—水力半径;ζz—涵洞出口局部水头损失系数;∑ζ—从进口到出口前不包括出口的各种局部水头损失系数之和;ht—以出口洞底为标高的出口水位m;H0—上游总水头m;i—涵洞底坡降;g—重力加速度;3无压涵洞淹没出流计算公式短洞302gHmbQ式中Q—涵洞过流量m3/s;σ—淹没系数;m—流量系数;b—过流断面计算宽度m;C—谢才系数;H0—上游总水头m4计算成果根据上述公式及涵闸的排涝要求,计算出各建筑物的结构尺寸见表322建筑物结构尺寸计算成果表表3序号干流桩号涵闸名称岸别排涝流量m3/s河底高程m结构尺寸m十年一遇支流干流孔数×高×宽130+135水坡涵闸右
0.
619.
016.4一孔φ=
0.7m圆管232+425沙河二村涵闸右
3.
719.
516.0一孔
2.0×
1.5m箱涵333+940沙河五村涵闸右
0.
920.
315.8一孔φ=
1.2m圆管435+285滩头村涵闸右
1.
119.
015.7一孔φ=
1.4m圆管538+935大码头涵闸右
3.
217.
015.2一孔
2.0×
1.5m箱涵2.消能计算1能计算工况为减少干流滩地以及河道的冲刷,保护支流入口涵闸,确定消能工况为支流十年一遇排涝水位,干流通航水位2各涵闸的消能计算成果见表4消能计算成果表表4序号干流桩号涵闸名称支流排涝水位m干流通航水位m消力池长m消力池深m130+135水坡涵闸
21.
8118.
76.
00.50232+425沙河二村涵闸
22.
2618.
79.
500.50333+940沙河五村涵闸
22.
1118.
76.
00.50435+285滩头村涵闸
22.
0118.
73.
50.50538+935大码头涵闸
21.
7418.
79.
500.50为减小消力池过大挖深,减少工程投资,在干、支流达到表中所列水位时,需控制闸门开启,一次开启高度控制在
0.2~
0.3m之间,闸下游水位抬高后,再控制闸门开启,直到闸门全开23§3-3稳定计算
一、计算工况1.施工完建期上、下游无水;2.正常运行期Ⅰ支流蓄水位,干流水位平闸底板;3.正常运行期Ⅱ干流防洪水位,支流水位闸底板以上1m因本次设计中,涵闸工程的主要任务是防洪、排涝,正常运行期Ⅱ也可作为校核工况,故不再对另外的校核工况的稳定计算
二、荷载组合荷载组合见表5涵闸荷载组合表表5计算工况结构自重土重土压力水重水压力扬压力完建期√√√运行期Ⅰ√√√√√√运行期Ⅱ√√√√√√
三、计算成果计算成果见表624稳定计算成果表表6抗滑稳定安全系数涵闸名称计算工况最大地基应力kn/m2最小地基应力kn/m2地基应力不均匀系数水坡涵闸完建期
77.
575.
21.
034.84运行期Ⅰ
70.
568.
41.
033.90运行期Ⅱ
50.
549.
01.
032.90沙河二村涵闸完建期__.
482.
81.
083.03运行期Ⅰ
85.
677.
81.
102.12运行期Ⅱ
82.
375.
51.
091.86沙河五村涵闸完建期
79.
660.
41.
032.74运行期Ⅰ
70.
559.
51.
032.85运行期Ⅱ
46.
258.
41.
038.67滩头涵闸完建期
79.
660.
41.
032.74运行期Ⅰ
70.
559.
51.
032.85运行期Ⅱ
46.
258.
41.
038.67大码头涵闸完建期__.
486.
81.
033.03运行期Ⅰ
85.
679.
31.
082.12运行期Ⅱ
82.
376.
91.
071.86
四、基础处理根据小清河干流治理工程中的涵闸工程地质资料,地基允许承载力一般在80~100kn/m2,由以上稳定计算成果可知,涵洞及闸室部分地基需进行处理本次设计中沙河二村涵闸、大码头涵闸洞身段基础采用
0.5m厚37灰土垫层置换处理,闸室段基础采用喷粉搅拌桩处理§3-4工程布置
一、沙河二村涵闸1.进口段沙河二村涵闸前为砌石拱桥,直径
1.0m进口段采用M
7.5浆砌块25石直墙,长
0.5m,底宽
1.5m,底高程
19.50m2.洞身段洞身段全长17m,1孔
2.0×
1.5mC20现浇钢筋砼箱涵,洞身坡降100mm箱涵壁厚
0.3m,
0.3×
0.3m抹角,每节长
9.5m,采用沥青杉板伸缩缝,中间设651塑料止水带洞身底高程
19.50~
19.40m,采用C10砼垫层、M
7.5浆砌块石基础3.闸室段闸室为M
7.5浆砌块石结构闸室长
3.9m,闸墩为重力式挡土墙顶厚
0.9m,墙后坡比1:
0.4机架桥板采用现浇C20钢筋砼闸门选用HZJ-Ⅱ型
2.0×
1.5m封闭式铸铁闸门,启闭机选用LQD-6t螺杆启闭机4.出口段出口段长
20.0m,为M
7.5浆砌石结构,分扭坡段、连接段扭坡段底宽由
1.5m变至
3.5m,底高程由
19.20m变至
18.70m,长
10.0m,边坡由直墙变至
12.0边坡;连接段底宽
3.5m,长
10.0m,底高程
19.20m,边坡
12.05.闸室及洞身基础处理洞身段基础均采用3:7灰土夯实处理,以增强地基承载力闸室段采用喷粉搅拌桩处理地基
二、沙河五村、水坡涵闸1.进口段进口段采用M
7.5浆砌石结构,护坡段长
6.0m,底宽
2.0m,边坡比1:
2.0,底高程
20.
3020.73m262.管身段管身段全长20m,管身坡降1/100,1孔φ
1.4m预制钢筋砼管,内径
1.4m,壁厚
0.13m,每节长
2.0m,对接节间缝用橡胶垫圈填塞,外面用水泥砂浆裹缝,管底高程
20.
3020.73m,下做M
7.5浆砌块石管座3.闸室段闸室为浆砌石结构,闸墩为重力式挡土墙,顶厚
0.65m,墙后坡比
10.4机架桥板采用现浇C20钢筋砼闸门选用HZY-1400m铸铁封闭闸门,启闭机选用LQC-3t螺杆启闭机4.出口段连接段长
13.5m,为M
7.5浆砌石结构,分扭坡段、连接段扭坡段底宽由
1.4m变至
2.0m,长
7.5m,底高程
19.
6220.05m,边坡由直立变至1:
2.0;连接段底宽
2.0m,长
6.0m,底高程
20.
1220.55m,边坡1:
2.05.闸室及管身基础处理闸室段、管身段基础均采用3:7灰土夯实处理,进行加固
三、滩头村涵闸1.进口段进口段采用M
7.5浆砌石结构,护坡段长
12.5m,底宽
3.0m,边坡比1:
2.0,底高程
19.00m2.管身段管身段全长18m,管身坡降1/100,1孔φ
1.2m预制钢筋砼管,内27径
1.2m,壁厚
0.12m,节长
2.0m,对接节间缝用橡胶垫圈填塞,外面用水泥砂浆裹缝,管底高程
19.00m,下做M
7.5浆砌块石管座3.闸室段闸室为浆砌石结构,闸室长
4.3m,闸墩为重力式挡土墙,顶厚
0.65m,墙后坡比1:
0.4机架桥板采用现浇C20钢筋砼闸门选用HZY-1200型铸铁封闭闸门,启闭机选用LQC-2t螺杆启闭机4.出口段出口段长
18.0m,为M
7.5浆砌石结构,分扭坡段、连接段扭坡段底宽由
1.2m变至
3.0m,长
12.0m,底高程
18.34m,边坡由直立变至1:
2.0;连接段底宽
3.0m,长
6.0m,底高程
18.84m,边坡1:
2.05.闸室及管身基础处理闸室段、管身段基础均采用3:7灰土夯实,进行加固处理
四、大码头涵闸1.进口段进口段采用M
7.5浆砌石结构,护坡段长
6.0m,底宽
2.0m,边坡比1:
2.0,底高程
17.00m2.洞身段洞身段全长18m,1孔
2.0×
1.5mC20现浇钢筋砼箱涵,洞身坡降100mm箱涵壁厚
0.3m,
0.3×
0.3m抹角洞身每节长9m,采用沥青杉板伸缩缝,中间设651塑料止水带洞身底高程
17.00~
16.90m,采用C10砼垫层、M
7.5浆砌块石基础283.闸室段闸室为M
7.5浆砌块石结构闸室长
3.9m闸墩为重力式挡土墙,顶厚
0.9m,墙后坡比
10.4机架桥板采用现浇C20钢筋砼闸门选用HZJ-Ⅱ型
2.0×
1.5m封闭式铸铁闸门,启闭机选用LQD-6t螺杆启闭机4.出口段出口段长
20.0m,为M
7.5浆砌块石结构,分扭坡段、连接段扭坡段底宽由
1.5m变至
3.5m底高程由
16.70m变至
16.20m,长
10.0m边坡由直墙变至1:
2.0边坡;连接段底宽
3.0m,长
10.0m,底高程
16.70m,边坡1:
2.0连接段以下顺原河道5.闸室及洞身基础处理洞身段基础均采用3:7灰土夯实处理,以增强地基承载力;闸室段采用喷粉搅拌桩处理地基§3-5结构计算结构内力计算机架桥板按简支梁计算,管身按涵管计算配筋根据最大控制内力值按钢筋砼结构有关公式计算,结果详见各部位钢筋图结构内力计算机架桥梁按简支梁计算,洞身按弹性地基梁计算配筋根据最大控制内力值按钢筋砼结构有关公式计算,结果详见各部位钢筋图29第四章施工__设计
一、施工__及管理本工程建设单位为济南市小清河管理处,为保证工程质量和进度,工程建设按“三制”执行以建设单位为业主,由业主聘用监理单位进行监理,施工采用招投标方式,选择具有相应资质的施工队伍承担
二、工程进度由于本工程建筑物分散,单项建筑物工程量小,工期较短,工程可在2002年汛后安排年底完成施工即2002年10月至12月完成,总工期3个月
三、施工条件5座涵闸均位于小清河右堤,堤外200m范围内均有沥青路面或碎石路面,交通方便,施工建筑材料可就近采购施工用电可由附近引入或自备柴油发电机组施工用水可采用当地浅层地下水大码头排水沟有水,需进行施工导流其他排水沟一般情况下无水
四、主体工程施工1.土方工程施工土方工程主要有闸基清基、开挖、上、下游围堰土方回填等,以机械化施工为主,人工开挖为辅土方开挖和回填,采取“集中弃土,就近回填”的原则30基坑土方开挖采用1m3挖掘机开挖,挖土机推运50m;土方回填采用推土机推运,拖拉机压实,或打夯机分层夯实2.护砌工程护砌工程施工前应先平整工作面,低洼处回填土料夯实砌筑石料应选择材质均匀、无风化裂痕,块重及厚度应满足设计要求砌筑时必须平整、密实、错缝合理,勾缝严密饱满,水平缝顺直3.混凝土及钢筋混凝土工程混凝土拌和采用
0.4m3搅拌机搅拌搅拌机的进料及出料均采用手推胶轮车运输,混凝土采用人工平仓,插入式振捣器振捣,人工撒水养护4.金属结构及砼预制构件的__工程__工程主要包括闸门及启闭机、预制梁板等__应遵循以下技术条件1金属结构制造厂家必须持有生产许可证;2闸门及启闭机设备__调试完毕,应做全行程起闭试验,试运行三次3砼预制梁板必须待强度达到70%以上,才能吊装5.止水、构造缝止水、构造缝的质量要达到设计要求651塑料止水带要平整、有弹性,严禁使用变形、撕裂的止水带塑料止水带热结合部位要切实粘好,防止开裂
五、主要施工质量要求1.施工质量检查验收,一律按水利部有关规程、标准和省市有关31规定2.技术要求1为保证地基土不受扰动,挖基时留
0.20m,施工前经监理人员检验并同意后,由专人开挖至设计标高2回填土必须分层夯实对要求回填灰土的部位必须掺料均匀回填干容重不得低于
16.5KN/m332第五章工程投资§5-1编制说明
一、编制依据1.山东省水利厅鲁水定字[2000]1号文颁发的《山东省水利水电工程概估算费用构成及计算标准》试行;2.山东省水利厅鲁水定字[2000]1号文颁发的《山东省水利水电工程概估算编制办法》试行;3.设计说明、图纸等;4.国家和主管部门颁发的有关法令、条例、规定等
二、定额采用1.土石方工程采用山东省水利厅鲁水定字[1998]2号文颁发的《山东省水利水电建筑工程预算定额》土、石方工程2.砌石及砼工程采用山东省水利厅鲁水定[1991]2号文颁发的《山东省水利工程预算定额》土、石方工程3.金属结构设备及__工程采用山东省水利厅鲁水定字〔1998〕2号文颁发的《山东省水利水电__工程概算定额》水利机械、金属结构__工程4.施工机械台班费采用山东省水利厅鲁水定[1993]4号文颁发的《山东省水利工程施工机械台班费定额》,并按鲁水定字[2000]1号文的规定将一类费用乘
1.35的调整系数5.定额中不足部分,参照有关专业定额补充33
三、基础单价1.人工预算单价人工预算单价
21.56元/工日2.主要材料预算__以当地市场__为原价另计运杂费和采购保管费其中另购砂、碎石、块石等预算价,超过40元/m3的按40元/m3进入工程单价,超过部分记取税金后列入相应部分之后金属结构设备的预算__,按最近生产厂家提供的出厂__作为设备原价,另计设备原价5%的运杂费和设备原价与运杂费之和
0.7%的采购保管费
四、费用标准1.其他直接费建筑工程按直接费的
2.5%计算;__工程按直接费的
3.2%计算2.现场经费土石方工程按直接工程费的
5.9%计算;混凝土工程按直接工程费的
6.3%计算;基础处理按直接费的
7.2%计算;设备__工程按人工费的45%计算;其他工程按直接费的
6.3%计算3.间接费土石方工程按直接工程费的
5.4%计算;混凝土工程按直接工程费的
4.1%计算;34基础处理按直接费的
7.2%计算;设备__工程按人工费的45%计算;其他工程按直接费的
6.7%计算4.企业利润按直接工程费、间接费之和的5%计算5.税金按直接工程费、间接费、企业利润三项之和的
3.22%计算
五、临时工程1.施工导流工程采用设计工程乘单价计算2.施工交通工程采用设计工程乘单价计算3.施工场外供电线路工程4.临时房屋建筑工程按第一至第四部分工程量之和的2%计算
六、其它费用1.建设单位管理费按一至四部分建安工程量的
3.0%计列;2.工程监理费按一至四部分投资合计值的
2.5%计列;3.建设及施工场地征用费1临时占地单价为450元/亩·季,占用时间为两季,另计200元/亩的青苗补偿费及2%的征迁管理费2永久占地按照“山东省实施《中华人民___土地管理法》办法”和鲁土用字[1999]22号文“转发省物价局、省___《关于调整征用土地年产值和地面附着物补偿标准的批复》”,济南郊区_____35元/亩4.生产及管理单位准备费按一至四部分建安工程量的
0.5%计列5.备品备件购置费按占设备费的
0.5%列6.工器具及生产家具购置费按占设备费的
0.15%计列7.资源勘察规划统筹费按勘测设计费的10%计列8.科学研究试验费按一至四部分建安工作量的
0.2%计列9.设计费按一至四部分投资合计值的
4.5%计列,另计设计费10%的预算编制费10.勘测费按测量__标准计取11.定额编制管理费按一至四部分建安工作量的
0.08%计12.工程质量监督费按一至四部分建安工作量的
0.2%计
七、预备费1基本预备费按一至五部分投资之和的1%计列36§5-2总投资本工程总投资
174.8万元其中,建筑工程
109.9万元;金属结构及__工程
16.6万元;临时工程
12.2万元;其它费用
34.4万元;预备费
1.7万元§5-3主要工程量及材料1.主要工程量土石方工程38372万m3砌石工程1___万m3混凝土工程239万m32.主要材料木材6m3水泥285t钢材11t。