空气系统调试程序(中英文对照)空气系统调试程序(中英文对照)AIR SYSTEMCOMMISSIONING PROCEDURE目录Content.准备工作1Preparation系统试机和启动
2.System StartUp基本风量测试步骤
3.Basic AirTesting Procedure基本风量平衡步骤
4.Basic AirBalancing Procedure变风量系统调试步骤
5.VAV SystemCommissioning Procedure-洁净室的平均或总气流量应为土10%The averageor totalairflow volumefor the cleanroom should bewithin±10%.
6.3Room PressurizationTests房间压力测试测试步骤TEST PROCEDURES-用测量和记录洁净室最里部和相邻空间、房间、或外部环境的压差PaMeasure andrecord thepressure differentialsin Pabetween theinnermost cleanroomand adjacentspaces,rooms,or theexteriorenvironment.洁净度测试
6.4洁净度测试是用Airborne particle count cleanliness classification test于测定测试时房间的实际颗粒数等级测试开始前按合同文件规定应了解有关颗粒的尺寸、室内的占用情况及房间分类The airborneparticle countcleanliness classificationtest isperformedto determine the actualparticlecountlevel within thefacility at the timeof thetest As-Built,At-Rest,or Operational.Particle sizesof interest,the roomoccupancy modeand theroomclassification shall be knownprior to the beginningof thetests andshall be as specified in the contract documents.测试步骤TEST PROCEDURES-核实Verification核实洁净室系统的各方面,这有助于保证操作的完整性空调、过滤系统、墙体、吊顶、地板等以下的主要测试应在进行洁净分类测试前进行Verify that all aspectsof thecleanroom systemwhich contributetoits operationalintegrity airhandling,filtration systems,walls,ceilings,floors,etc.are completeand functioning.The followingprimarytests shall be completedprior toperforming the验收cleanlinessclassificationtests:ACCEPTANCE温度和湿度等级的验收标准和要求应符合合同文件的规定Acceptable criteriafor temperatureand humiditylevels andrequirementsshallbeasspecifiedin thecontractdocuments.照度级测试
6.6Lighting LevelTests照度测试的目的是核实安装后的照度级符合要求The purposeof thelighting leveltests isto verifythat installedlightinglevels meetthe specifiedrequirements.灯具调节-新安装的高照度灯具或荧光系统,在测定Lamp Conditioning:a.3开始前至少要有个100工作小时…For highintensity,or fluorescentsystems,in relativelynew lampinstallations,at least100hours ofoperation shouldelapse before对于常规尺寸的白炽灯,调节时效为个小时measurements aretaken b.20或更久With incandescentlamps,seasoning is accomplished in20hours ormorefor commonsizes高照度或荧光系统在测定开始前必须先点亮至少个小时,以保障已获得正C.2常工作输出和温度A highintensity dischargeor fluorescentsystem mustbeilluminated for at leasttwo hoursbefore measurementsare takentobe surethat normaloperating outputand temperaturehas beenattained测定条件亮度测定应该在实际工作条件下进行该区域-Measurement Conditions:a.的所有照明包括普通照明、工作岗位照明和补充照明应可以正常使用Luminance measurementsshould be made underactual workingconditions.All lightinginthearea includinggeneral lighting,tasklighting andsupplementary lightingshould bein normaluse.测定应该在工作面的标高展开,从日光和电子照明设施都正常的指定工作点b.开始Measurements shallbemadeat worksurface elevationand fromaspecified workpoint locationwith thecombinations ofdaylightand electriclighting facilitiesavailable.核实这些空间的热状况稳定c.Verify thatthe thermalconditions of thespace arestable应注意并考虑到自然照明光源的影响d.Care andconsideration shouldbe givento identifythe influenceofnatural lightingsources用测定格网用于覆盖工作面的代表区域工作面上的任何阻碍物、包括柱子、高的设备、档案柜等都要在报告中反映出来-A measurementgrid shallbe determinedand shouldbepositioned tocover arepresentative areaof the working plane.Anyobstructions abovetheworkingplane,away fromcolumns,tallpieces ofequipment,filing cabinets,etc.shallbenoted inthereport洁净室测试步骤
6.Clean RoomTests Procedure风险评估和安全措施
7.Risk Assessmentand SafetyMethod.附件8Attachment部分章节示例如下准备工作
1.Preparation下列风量平衡步骤是各种空气系统平衡的基础The followingbalancing proceduresare basicto alltypes ofairsystems.)确认影响空气系统气流的每一项已经为做好准备,如门窗已关1TAB好,顶板(回风静音箱)就位等Confirm thatevery itemaffecting the airflow ofa ductsystem isreadyfor theTAB work,such asdoors andwindows beingclosed,ceiling tilesreturn airplenums inplace,etc.)确认所有的自动控制仪器不会影响到2TAB.Confirm that all automaticcontrol deviceswill notaffect TABoperations.)创造条件,使空调系统在最大负荷情况下运行,确保空调箱有冷凝水产生3Establish theconditions forthe maximumdemand systemairflowwhich generallyisacooling applicationwith wettedcoils.系统启动
2.System StartUp风机检查
2.1Fan check在核查所有风阀已打开或设置好后,电工应启动所有相关系统(回风,排风排烟等),使所有需要平衡的系统相关风机达到设计转速启动风机后,立即检查风机、电动机和风棚区动是否存在故障,及电机电流强度如果电流强度大大超过铭牌上的满载,关闭风机检查存在问题然后仔细重启风机做必要调整After verifyingthatalldampers areopen orset,have thejobelectrician startall related systems return,exhaust,etc.and thesystembeing balancedwith each fan runningatthe design speedrpm.Upon startingeachfan,immediately checkthe fan,motorand fandrive formalfunctions,and themotor amperage.If theamperagegreatly exceedsthe nameplatefull loadamperage,stopthe fanto determinethe problem.Then carefullyrestart the fan tomakethe necessaryadjustment.风阀检查
2.2Damper check快速检查每个没有闭合或断开自动风阀,确认风阀自动控制位置正确如果风阀不规则振荡,气流会受到影响,这是风量平衡中不希望看到的因此,风阀及其控制模块应经过设置使之正确就位所有风阀都应设置为全开冷却状态Quickly goto eachautomatic damperthat hasntbeen blockedordisconnected andconfirm thatthe damperis beingcontrolledautomatically incorrect position.There will be someeffect ontheairflow ifthese dampersare hunting.This isundesirable whiledoingair balancing.Therefore,the dampersor theircontrolsshouldbe set tokeep theminthedesired position.Alldampers shouldbesetforafull flowcooling condition.气流、压力检查
2.3Flow/Pressure check再次确认需要平衡区域涉及到的相关区域中,所有风机运转良好如果有问题,压差、渗透或渗漏可能对系统平衡造成不利影响初步测试可确认每个系统的送风量是否超过排风量此时应该确认正负压力区Again confirmthatallrelatedsystemfans servingeach areawithinthe spacebeing balancedare operating.If theyare not,pressuredifferences,and infiltrationor exfiltrationmay adverselyinfluencethe balancing.Preliminary studieswill haverevealed whetheror notthe supply air quantity exceedsthe exhaustair quantityfrom eacharea.Positive andnegative pressurezones shouldbe identifiedatthis time.基本测试步骤
3.Basic AirTesting Procedure风机测试
3.1Fan Testing将皮托管置于主风管或排风风管以测定处于设计转速的送风机所送风日MoDetermine thevolume ofair beingmoved bythesupplyfan atdesignrpm byusing Pitottube traverseof themain ductor theductsleaving fandischarge.如果在设计转速时风量达不到设计风量的,可检查各系统情况、步骤和±10%记录数据,找出原因检查并记录过滤器、盘管、分离机及消声器等的气压下降,看是否存在过多损耗特别要检查进风口和排风口出风管和外壳状况以达到系统效果If thefan volumeis notwithin plusor minus10percent ofthedesign capacityat designrpm,determinethereason byreviewingall systemconditions,procedures andrecorded data.Check andrecord theairpressure dropacross filters,coils,eliminators,soundtraps,etc.to seeif excessiveloss isoccurring.Particularly studyductand casingconditions atthefaninlet andoutlet forsystemeffect.每当转速发生变化,或主风阀的设置发生改变,要经常复查电流强度Always recheckthe amperagewhenever anyrpm changeor majordampersetting changeis made.基本气流平衡步骤
4.Basic AirBalancing Procedure平衡标准
4.1Balance criteria当符合以下情况时,系统达到平衡The systemwillbeconsidered balancedwhen:)经测量后,每个送风口或回风口的风量值为设计风量时(除非出现1±15%不可控因素)The valueoftheairquantityof eachinlet oroutlet deviceismeasured andfound tobe within±15percent ofthedesignairquantities unlessthere arereasons beyondthe control)最不利环路中的风口阀门应全开2The terminaloutlet inthe circuitwith thegreatest resistanceshallbe fullyopen.风量平律》
4.2Performing airbalancing根据.基本风量测试步骤所述进行初步空气系统工作3TABPerform theinitial airsystems TABwork asdescribed under
3.Basic AirTesting Procedure.风量和换气次数测试
6.2Air flowvolume andair changerate测试步骤Test Procedures-使用风量测量风量罩测量每个过滤器或送风扩散器的气流量风量罩需带合适流量计Flow measuringhoods arepreferred fortaking airflow volumemeasurements fromeach filteror supplyair diffuser.The flowhoodwithan appropriateflow meteris required.-将风量罩紧紧置于过滤器框架中以防止漏气Seat theflow measuringhood firmlytothefilter frameto preventairleakage.-风量罩尺寸应足够大以捕获受测过滤器外的所有空气The flowhoodshallbeadequately sizedto captureall theair exitingthefilter beingtested.-测量并用每小时/立方米记录每个过滤器的气流量cmhMeasure andrecordtheairflow volumesof eachfilter incubicmeter perhour cmh.验收Acceptance-洁净室每个过滤器的平均气流量应为±15%The averageairflowvolumeof eachfilter forthecleanroomshouldbe within±15%.。